Mobile welding · Ortonville, MI

Huerta's Arc Works

Certified welder with my own rig. MIG, TIG and stick welding, repairs and custom metal work — done right, at your place.

Certified welderI come to youFree quotes

What I weld

One welder, one truck, every process. If it's metal and it's broken — or it doesn't exist yet — call me.

From the shop

Real welds, real jobs. Every photo here is my own work.

How it works

No runaround. You talk to the guy doing the welding, start to finish.

Got something broken?

Get a free quote
Services

What I weld

MIG, TIG and stick, on site or at my place. Repairs, rebuilds and custom pieces made to fit.

Bracket weld still glowing with heat colors

How it works

No runaround. You talk to the guy doing the welding, start to finish.

Don't see your job?

Ask me anyway
Recent work

Recent jobs

Real work for real customers around Ortonville. Here's the kind of job I take on.

Steel handrails installed around a paver patio
Black steel handrails installed around a raised paver patio and steps
Featured jobPatio & step handrails

Job blueprints

Every job gets planned before the welder comes off the truck. Here are four real job plans. Tap a drawing to see it full size.

Inspect firstFirm price only after I've looked it over
Solid metalCut and prep back to clean steel, never weld over rust
Fire watchExtinguisher on hand and checked after every session
PhotosBefore, during and after shots of every repair
Clean upDebris and scrap hauled away
Job blueprintTruck floor pan repair
Sheet01
ProcessMIG
Material18–16 ga
PLAN VIEW — DRIVER CAB FLOOR ROT / HOLES CUT LINER CORNERS 1" MIN INTOSOLID METAL TACK 1–2" O.C. BUTT JOINT1/16" GAP STITCH ½–1"SKIP AROUND
  1. Disconnect the battery and strip the seat, mat, sound deadener and sill plate.
  2. Inspect. Wire-wheel and probe to find where solid steel starts. Check cab mounts, crossmembers and lines underneath.
  3. Mark and cut at least 1" into good metal with rounded corners. Keep the old piece as a template.
  4. Make the patch from a cardboard template, with bends or beads to match the floor.
  5. Prep the edges to bare metal. Weld-through primer on any overlap.
  6. Fit and tack every 1–2", working opposite sides so nothing pulls.
  7. Stitch weld ½–1" at a time, skipping around to keep heat down. No long beads.
  8. Grind, seal and coat. Seam sealer, epoxy primer and bedliner top and bottom.

Materials

  • Matching sheet steel
  • .023 MIG wire
  • C25 gas
  • Weld-through primer
  • Seam sealer
  • Epoxy primer
  • Rust converter
  • Bedliner / undercoat

Safety checklist

  • Battery disconnected before cutting
  • Fuel and brake lines located and shielded
  • Flammables cleared 6" from the weld
  • Extinguisher in reach, re-checked 30 min after
Job blueprintLadder handrail repairs
Sheet02
ProcessMIG
Scope32 welds
ELEVATION — LADDER HANDRAIL (TYP.) 123456789 DETAIL A — FILLETALL AROUND GMAW MIG · 32 JOINTS TOTAL
  1. Walk the site and mark every joint that needs work, so the scope is set before day one.
  2. Grind paint and rust off each weld area, down to clean metal.
  3. MIG weld each joint and repair point on the identical railing units.
  4. Grind and clean every weld. Slag and spatter gone, smooth where hands touch the rail.
  5. Anything extra I find gets discussed with you before I touch it.
  6. Optional repaint of each weld area in safety yellow to match.
  7. Clean up and haul away all grinding debris and scrap.

On site

  • One working day
  • Mobile rig
  • Grinding & flap discs
  • Wire & shielding gas
  • Safety-yellow paint

Safety checklist

  • Follow the facility's hot-work and fire-watch rules
  • Safe access or lift for elevated welds
  • Work area cleared and swept after
Job blueprintDoor step handrails
Sheet03
FinishBlack
Reach24 in

Side view — one handrail, drawn to scale

Side view drawing of a floating handrail: wall angle bolted to brick, rail sloping 24 inches out over the steps with a brace underneath, 34 inches above the step edges
  1. Measure on site — landing depth, step height and step width. Mark H1 and H2 about 3" in from each end.
  2. Cut 2 rails, 2 wall angles and 2 braces. Rail ends cut plumb at 26½°.
  3. Drill three 7/16" holes in the flat leg of each wall angle.
  4. Jig it on the bench. Tack, check the 26½° slope and 24" reach, then weld all around.
  5. Weld on end caps and grind smooth where a hand slides along the rail.
  6. Fit to the wall — rail 34" above the step edges, angle plumb, holes marked.
  7. Anchor into solid brick, not mortar. Blow out the holes, set anchors, snug the nuts.
  8. Prime and paint black to match the patio fence. Touch up the anchor nuts.

Layout — plan and front view

Plan and front view of two handrails, H1 and H2, either side of the door steps

Key numbers

Sticks out from wall24 in
Rail height34 in above step edges
Rail slope26½°
Rail1½ in round tube, 14 ga
Wall angle2×2×¼, 27 in
Brace1½×1½×3/16 angle, ~37°
Anchors3 per angle, ⅜ in

Before drilling

  • Anchor into solid brick, 1½" from edges and joints
  • Hollow or cored brick gets epoxy anchors with screen sleeves
  • Load-test by leaning hard on the end before use
  • Check local code on rail returns with the inspector
Job blueprintSteel wire fence
Sheet04
Height36 in
Length14 ft

Front elevation and details

Front elevation of a 14 foot steel fence with three posts, top rail and three strands of wire, plus post and base plate details
  1. Cut 3 posts to 34" and the top rail to 168". Cut plates and gussets.
  2. Clamp the posts side by side and mark holes at 9, 18 and 27" so they line up.
  3. Drill 5/16" wire holes with a step bit. Deburr both sides so the wire won't cut.
  4. Drill the plates — four 7/16" anchor holes, 1" from the edges.
  5. Weld each post square and centered on its plate, with 2 gussets along the fence line.
  6. Set posts 84" on center. Tack the top rail, check plumb and square, then weld out.
  7. Anchor to the brick — drill into the brick face, not the mortar joint, blow out, set anchors.
  8. Run the wire through all 3 posts, tie off one end and tension at the other.
  9. Cap the rail ends. Prime and paint or cold-galvanize all welds and holes.

Cut list

Posts, 2 in sq tube 14 ga3 × 34 in
Top rail, 2 in sq tube 14 ga1 × 168 in
Base plates, ¼ in steel3 × 6×6 in
Gussets, ¼ in steel6 × 2×2 in
Masonry anchors, ⅜ in12
Fence wire, 12.5 ga3 runs
Wire tensioners3

Check before anchoring

  • Solid brick or block with good mortar under each plate
  • Thin veneer or soft pavers can let anchors pull out
  • Anchors at least 1½" from any brick edge
  • All welds and drilled holes sealed against rust

Job notes

A few of the repairs I've done lately.

Weld gallery

Tap any photo to see it full size.

Need something like this?

Get a free quote
Service area

Service area

Based in Ortonville. My rig comes to you across Oakland, Genesee and Lapeer County.

Pickup truck with a custom hitch-mounted build

Towns I cover

Based in Ortonville and covering Oakland, Genesee and Lapeer County. Further out in Michigan? Call anyway — bigger jobs are worth the drive.

In the area?

Get a free quote
Free quotes

Get a quote

Tell me what's broken or what you want built. Photos help — text them over after you send this.

Fillet weld along a steel plate

Call or text

Fastest way to get on the schedule. Weekday evenings and weekends.

Phone
Email
Based inOrtonville, MI
Your request — send it by text or email

          
Text it